Coat the slab, not the door
Property, prep notes, coat schedule and cure window stay on one job. 14-day free trial, no credit card required.
Start your 14-day free trial · 14-day free trial, no credit card required.

How epoxy flooring work stays connected
- Prep notes. Slab preparation is documented.
- Coat schedule. Coats are planned on the job.
- Cure window. The cure time is tracked.
Coat the Slab, Not the Door
A garage floor coating
The crew follows the prep notes and coat schedule, and the cure window is tracked until handover.
Send quotes, schedule and dispatch jobs, document work in the field, then invoice and get paid.